Long Range Committee Form
Long Range Committee Form (1).docx
carsonelem
carsonelem.pdf
stevensonelem
stevensonelem.pdf
stevensonhigh
stevensonhigh.pdf
Closure of facilities written analysis - WRMS
Closure of facilities written analysis - WRMS.pdf
Enrollment Forecast Summary
Enrollment Forecast Summary.pdf
State of the District Stevenson-Carson Long Range Facilities Planning Committee 5-1-18 (2)
State of the District Stevenson-Carson Long Range Facilities Planning Committee 5-1-18 (2).pdf
2018 Washington Sustainable School Protocol
2018 Washington Sustainable School Protocol.pdf
2018WSSP-Scorecard
2018WSSP-Scorecard.pdf
HighPerformanceSchoolGuidelines
HighPerformanceSchoolGuidelines.pdf
WashingtonEnergyCodeRoadmap2015091
WashingtonEnergyCodeRoadmap2015091.pdf
Reconfiguration Options from March 3 2007
Reconfiguration Options from March 3 2007.pdf
Long Range Educational and Facilities Plan
Long Range Educational and Facilities Plan.pdf
Round Table Discussion Complete Notes
Round Table Discussion Complete Notes.pdf
Round Table Flyer #1
Round Table Flyer #1.pdf
Round Table Flyer #2
Round Table Flyer #2.pdf
Round Table Flyer #3
Round Table Flyer #3.pdf
Round Table Flyer #4
Round Table Flyer #4.pdf
Round Table Flyer #5
Round Table Flyer #5.pdf
Round Table Flyer #6
Round Table Flyer #6.pdf
Round Table Flyer #7
Round Table Flyer #7.pdf
Round Table Flyer #8
Round Table Flyer #8.pdf
Round Table Flyer #9
Round Table Flyer #9.pdf
Round Table Flyer #10
Round Table Flyer #10.pdf
Round Table Discussion #1
Round Table Discussion #1.pdf
Round Table Discussion #2
Round Table Discussion #2.pdf
Round Table Discussion complete notes
Round Table Discussion complete notes.pdf
Round Table Discussions #3
Round Table Discussions #3.pdf
April 10 minutes
April 10 minutes.pdf
Poster notes #1
Poster notes #1.pdf
May 1 Agenda
May 1 Agenda.pdf
Stevenson-Carson Long Range Facilities Planning Committee 5-1-18 (2)
Stevenson-Carson Long Range Facilities Planning Committee 5-1-18 (2).pdf
May 1 minutes
May 1 minutes.pdf
May 15 Agenda
May 15 Agenda.pdf
May 15 minutes
May 15 minutes.pdf
May 15 documents
May 15 documents.pdf
2017-18 Academic Goals May 15
2017-18 Academic Goals May 15.pdf
Agenda for 5.29
Agenda for 5.29.pdf
Energy and staffing
Energy and staffing.pdf
May 29 minutes
May 29 minutes.pdf
June 12 minutes
June 12 minutes.pdf
June 12 agenda
June 12 agenda.pdf
Long Range Planning Update for School Board
Long Range Planning Update for School Board.pdf
September 11 agenda
September 11 agenda.pdf
September 11 minutes
September 11 minutes.pdf
Options from Sept 11 meeting
Options from Sept 11 meeting.pdf
SCSD Cost Benefit DRAFT 090618
SCSD Cost Benefit DRAFT 090618.pdf
2018-09-10_SCSD Site Presentation
2018-09-10_SCSD Site Presentation.pdf
Current Classroom configuration
Current Classroom configuration.pdf
September 25 agenda
September 25 agenda.pdf
SCSD Cost Benefit DRAFT2 092418
SCSD Cost Benefit DRAFT2 092418.pdf
2018-09-24_SCSD Site Presentation
2018-09-24_SCSD Site Presentation.pdf
September 25 minutes
September 25 minutes.pdf
Oct 9 Long Range Plan round table
Oct 9 Long Range Plan round table.pdf
Enrollment Forecast Summary
Enrollment Forecast Summary.pdf
Square footage New and Remodel
Square footage New and Remodel.pdf
Oct 22 Long Range Plan round table
Oct 22 Long Range Plan round table.pdf
Notes from October 22 round table
Notes from October 22 round table.pdf
October 23 agenda
October 23 agenda.pdf
October 23 minutes
October 23 minutes.pdf
November 27 agenda
November 27 agenda.pdf
November 27 minutes
November 27 minutes.pdf
WREC Scheme A 2nd Floor
WREC Scheme A 2nd Floor.pdf
WREC Scheme A
WREC Scheme A.pdf
WREC Scheme B
WREC Scheme B.pdf
WREC Scheme B-REVISED
WREC Scheme B-REVISED.pdf
WREC Scheme C
WREC Scheme C.pdf
WREC Scheme C-REVISED
WREC Scheme C-REVISED.pdf
WREC Scheme D
WREC Scheme D.pdf
WREC Scheme E
WREC Scheme E.pdf
WREC Scheme F
WREC Scheme F.pdf
SES Concept A
SES Concept A.pdf
SES Concept B
SES Concept B.pdf
SES Concept C
SES Concept C.pdf
SES Scheme A
SES Scheme A.pdf
SES Scheme B
SES Scheme B.pdf
SES Scheme C
SES Scheme C.pdf
SCSD Long Range Facilities Plan Input March 2019
SCSD Long Range Facilities Plan Input March 2019.pdf
WREC PK-5- A
WREC PK-5- A.pdf
WREC PK-5- B
WREC PK-5- B.pdf
SES 6-8
SES 6-8.pdf
Final Concept 9-1-19 Wind River Education Center
Final Concept 9-1-19 Wind River Education Center.jpg
Final Concept 9-1-19 Stevenson Elementary
Final Concept 9-1-19 Stevenson Elementary.jpg
CONCEPT 1- WREC to ES
CONCEPT 1- WREC to ES.pdf
CONCEPT 2- SES to MS
CONCEPT 2- SES to MS.pdf
#2 Stevenson-Carson Long Range Facilities Plan : This is the long range facilities plan as of May 2019
#2 Stevenson-Carson Long Range Facilities Plan.pdf
Appendix B SCSD Site photos
Appendix B SCSD Site photos.pdf
Appendix D SCSD Cost Benefit 7-16-19
Appendix D SCSD Cost Benefit 7-16-19.pdf
Appendix D-1 Bldg Concepts - Initial
Appendix D-1 Bldg Concepts - Initial.pdf
Appendix D-2 Bldg Concepts - Round 1
Appendix D-2 Bldg Concepts - Round 1.pdf
Appendix D-3 Final Concepts
Appendix D-3 Final Concepts.pdf
1 Study and Survey 2020
1 Study and Survey 2020.pdf
Appendix A-1 Stevenson-Carson Site Inventory (Report 3) (9-9-19)
Appendix A-1 Stevenson-Carson Site Inventory (Report 3) (9-9-19).pdf
Appendix A-2 Stevenson-Carson Inventory of Sites and Buildings (9-9-19)
Appendix A-2 Stevenson-Carson Inventory of Sites and Buildings (9-9-19).pdf
Appendix A-3 Stevenson-Carson Facility Drawings
Appendix A-3 Stevenson-Carson Facility Drawings.pdf
Appendix A-4 Stevenson-Carson Detailed Condition Assessment By Building (9-9-19)
Appendix A-4 Stevenson-Carson Detailed Condition Assessment By Building (9-9-19).pdf
Appendix A-5 SCSD BUILDING SUMMARY NARRATIVES (Feb 2020)
Appendix A-5 SCSD BUILDING SUMMARY NARRATIVES (Feb 2020).pdf
Appendix C ICOS Enrollment Projections (Report 1049)
Appendix C ICOS Enrollment Projections (Report 1049).pdf
Appendix D-4 SES and WREC Final Concepts Potential Costs (2-12-20)
Appendix D-4 SES and WREC Final Concepts Potential Costs (2-12-20).pdf
Jan 15 agenda
Jan 15 agenda.pdf
1
2